|
The Cornerstone Building was the first office building designed and constructed
by Weston Miles Architects for our offices. The 5,600 square foot
building was constructed in 1994 of steel studs and a Dryvit exterior
and was designed for retail downstairs and office or potential
residential upstairs. Located on Monterey Highway and the Dryvit
provided additional insulation from traffic noise. Housing a hair
salon, a bagel shop and initially WMA’s offices upstairs; the program
required great care in mechanical system design and separations
of the spaces due to potentially competing fumes and aromas. The project was completed in 9 months with the steel stud and metal frame construction
allowing for continual work in the winter saving time and ultimately
cost. As the owner, architect and contractor, this project gave
us the opportunity to fully understand the budget and schedule
and how small issues can have significant impacts.
Sustainability was incorporated by the inclusion of operable windows and high
efficiency lighting and mechanical systems and although the project
was constructed 13 years ago the maintenance has been minimal
due to straight forward selection of materials.
The Cornerstone has set the standard for proposed new development on 3rd street
and is often shown in Morgan Hill City brochures as the face
on downtown. |